Our Projects gallery

There are some of our Clients project including the old and Current projects we have worked on;

Works Performed as prime contractor

Project name and Country Name of Client and Contact Person Type of work performed and year of completion Year and Duration
 

CONSTRUCTION OF RESIDENTIAL BANGALOW AT NAGURU

 

Mr. JOSEPH OKWALINGA

 

The works included but was not limited to: Construction of luxurious bungalow containing 4 self contained bed rooms, 2 lounges, dinning room kitchen, guest wing, servants’ quarters, driveway, parking yard and boundary wall all in a 1.4 acre plat complete with, roofing and external works. Works completed 100%

12 months

 

Year: 2005

 

CONSTRUCTION OF OFFICE BUILDING FOR NAKAPIRIPIRIT DISTRICT LOCAL GOVERNMENT

 

NAKAPIRIPIRIT DISTRICT LOCAL GOVERNMENT

Construction of a 240 SqM office building in reinforced concrete columns, beams, plastered and painted burnt Clay Bricks walls: burnt clay roof tiles on steel trusses: Casement windows and doors, wooden doors internally; floors finished in ceramic tiles on cement and sand screed; plastered and painted ceilings; electrical and mechanical (plumbing ) installations. External Works and finishes including soil, waste water drainage, general landscaping and tarmac to drive way area. Works completed 100% 6 months

 

Year: 2005

 

CONSTRUCTION OF 4 STAR HOTEL COMPLEX IN THE HEART OF KAMPALA CITY

 

CITY ROYAL RESORT HOTEL Plot 8-10, Kataza Close 1; Bugolobi Kampala +256 41 4258037/258046

 

The Works Consisted but was not limited to; Construction of 40 air conditioned rooms for a luxurious hotel in bugolobi area complete with a conference room, restaurant and other amenities Works completed 100%

24 months

 

Year: 2005/2007

 

EXPANSION/ EXTENTIONS TO A 4 STAR HOTEL COMPLEX IN THE HEART OF KAMPALA CITY

 

CITY ROYAL RESORT HOTEL Plot 8-10, Kataza Close 1; Bugolobi Kampala +256 41 4258037/258046

 

The Works Consisted/ Covered and area of 2000 SqM but was not limited to; Construction of a conference room, swimming pool, commercial kitchen, dinning room, restaurant, Electrical, mechanical and External works to include landscaping, drive way, gardens and access road. Works completed 100%

24 months

 

Year: 2007/2010

 

CONSTRUCTION OF COTTAGES AT MBALE RESORT HOTEL.

 

MBALE RESORT HOTEL

 

The Works Consisted but was not limited to; Construction of 18 No. luxurious cottages at the Mbale resort Hotel complete with Electrical, mechanical and External works. Works completed 100%

8 months

 

Year: 2008

Construction of Seed Secondary school at Kabalega SS, Masindi Ministry of Education and Sports

P.O. Box 7063,Kampala

The work consists of construction of 8 classroom blocks, 1 Library and 1 laboratory including external works, electrical and mechanical installations, Works completed 100% 1 year

Year 2009- 2010

Construction of Seed Secondary school at Kigezi College Butobere, Kabale Ministry of Education and Sports

P.O. Box 7063,Kampala

The work consists of construction of 6 classroom blocks, 1 Library, 1 laboratory and 4 unit staff house including external works, electrical and mechanical installations, Works completed 100% 1 year

Year 2009- 2010

Expansion of Koome SSS and Nagullu SSS Ministry of Education and Sports

P.O. Box 7063,Kampala

The work consists of construction of 6 Unit Storied and 2 Unit classroom blocks, 2 No. Headmaster House and 2no. 4 unit staff house including external works, electrical and mechanical installations, Works completed 100% 1 year

Year 2011- 2012

CONSTRUCTION OF ONE(1) FOUR STOREY STAFF ACCOMODATION BLOCK AT HOIMA REGIONAL REFERAL HOSPITAL HOIMA REGIONAL REFERAL HOSPITAL P.O. Box 5, Hoima The Works Constituted but was not limited to; Construction of one (1) four storey staff at Hoima Regional referral Hospital complete with Electrical, mechanical and External works. Works Completed 100% 24 months Year: 2010/2012
 

CONSTRUCTION OF STAFF CANTEEN / EXTENTIONS OFFICE BLOCK OF 4 STAR CITY ROYAL RESORT HOTEL COMPLEX IN THE HEART OF KAMPALA CITY

 

CITY ROYAL RESORT HOTEL Plot 8-10, Kataza Close 1; Bugolobi Kampala +256 41 4258037/258046

 

The Works Consists of four floor multi stored block with external kitchen, Staff canteen, production kitchen with equipment, Electrical, mechanical and External works to include landscaping, drive way, and access way. Works completed 100%

16 months

 

Year: 2011/2012

CONSTRUCTION OF HOIMA CENTRAL MARKET IN HOIMA MUNICIPALITY, HOIMA DISTRICT -UGANDA Ministry of Local Government, Address: P.O. Box 7037, Kampala. The Works Constituted but was not limited to; Construction of 4 –Storeyed modern market and other amenities.

The works involve Ground and Foundation Engineering works, erection of structural works and Heavy Mechanical and Electrical works.

There was a high level of concrete and steel Technology expertise used in these works. This was due to the large volumes of concrete and steel used in these works. The quality control was a key priority as there was a high level of inhomogeneity at the material pits; this necessitated continuous design mix adjustments. An onsite Laboratory was setup for quality control with Over 5000 Cubic Meters of medium grade (C25/30) concrete was poured . Works completed 100%

24 months Year: 2011/2013
Rehabilitation and Expansion of Facilities at Ngora High School and Sebei College Tegeres- Lot 17 Ministry of Education and Sports

P.O. Box 7063,Kampala

The work consists of construction of 2 No. 6 Unit Storied Classroom Block, 2 No. Laboratory Blocks, Library Block and 2 No. Staff Houses including external works, electrical and mechanical installations. The major components of the works was the M&E as well as the concrete and steel works. Works completed 100% 1 year

Year 2012- 2013

Proposed Rehabilitation and Expansion of Busoga College Mwiri- Lot 35 Ministry of Education and Sports

P.O. Box 7063,Kampala

The work consists of construction of a Classroom and Laboratory Block, and Library Extension, Refurbishment of Senior Chemistry & Physics Laboratory, Junior Biology & Chemistry Laboratory Junior Physics & Chemistry Laboratory, Senior One Block, and Hannington House including external works, electrical and mechanical installations, Works completed 85% 1 year

Year 2013- 2014

Rehabilitation and Expansion of two UTCs at Elgon & Lira and one NTC at Unyama Ministry of Education and Sports

P.O. Box 7063,Kampala

The work consists of construction of Classroom Block 1,Workshop Block, Civil Laboratory Block, Electrical and Mechanical Laboratory Block 2, Student’s Hostel Block, Medical Centre & Sick Bay, Ablutions Block including external works, electrical and mechanical installations, Works completed 65% 1 year

Year 2013- 2014

Completion of the Construction of Bulamu Seed Secondary School(Lot 44) Ministry of Education and Sports, P.O.BOX 7063 Kampala The work consists of completion of construction of Bulamu Seed secondary School comprising of 6 unit Classroom Block 1,Library Block, Staff House Type 1 and III, Toilets type A,B and C(2No) including external works, electrical and mechanical installations, Works completed 100% September 2014
The Second Northern Uganda Social Action Fund(NUSAF 2) Project Kaabong District Local Government, P.O.BOX 16 Kotido-Uganda The works consists of construction of Staff Houses, Kitchen and Toilet blocks in five different sub counties in Kaabong District Works completed 65% December 2014
Renovation of 4 wards at Tororo Prison Uganda Prison Service Headquarters P.O.BOX 7128 Kampala The works consists of renovation of 4 no wards at Tororo Prison comprising of demolitions, renovations including external works, electrical and mechanical installations. Works completed 85% December 2014
Construction of a twin ward at Ruimi Farm Prison Uganda Prison Service Headquarters P.O.BOX 7128 Kampala The works consists of Construction of a Twin Ward at Ruimi Farm Prison including masonry works, mechanical and electrical plus associated amenities. Works completed 90% December 2014
Construction of Cotton Store at Mubuku Farm Prison Uganda Prison Service Headquarters P.O.BOX 7128 Kampala The works consists of Construction of the Mubuku Farm Prison including external works, electrical and mechanical installations. Works completed 65% November 2014
Construction of One Stop Border Post at Katuna Ministry of Works and Transport

P.O.BOX 7174 Kampala

The works consists construction of main building, verification shed, scanner shed and warehouse, power house, target booths (3no.), general external works Heavy mechanical and electrical installations as well as Earth works.

The complexity of the job was in the earth works as shown below;

Heavy Earth works were involved as the structures are to be found on swampy ground, which is always watery hence necessitating reclamation with G7 and G15 material to minimize the effects of differential settlement. While ensuring a flat water table. Monitoring of the rate of settlement as well as how much settlement has been done.

Due to the nature of the ground on which the buildings were being founded, the durability as well as the mechanical strength properties of the concrete and steel was a major factor. Hence it was necessary that the concrete acquires a high degree of hydration in relation to its ultimate degree of hydration in the quickest possible time, our technical expertise enabled us create design mixes to the meet C30/35 strength necessities. Works completed Ongoing

June 2015
Construction of Orom Prison Facility Uganda Prison Service Headquarters P.O.BOX 7128 Kampala These works involved the construction of Inmate wards, kitchen, Cotton store, High level security Barriers as well as staff quarters, the complexity of the works was in the logistical works involved, this is due to the remote nature of where the Prison facility was located and as hence a high level of precision was employed in delivering the necessary resources to the site while delivering the project on time. Works completed 100% April 2018
Construction of Steel Framed Industrial warehouses CITY ROYAL RESORT HOTEL Plot 8-10, Kataza Close 1; Bugolobi Kampala +256 41 4258037/258046 This involved the construction of composite steel-concrete industrial structure. This involved incorporating the latest technologies in the establishment of modern buildings where all the sub structure works are concrete with the Frames being steel. This was a design and Build contract where the Client requested for a turnkey job

The structure was founded on high water table soil and as hence the foundation was laid on rock fill gabion matts to ensure that water was moving undisturbed under the structure. Works completed 80%

AMUGOLI GENERAL ENTERPRISES LTD © All Rights Reserved.2020